Government & Infrastructure
Presidential Flight Arrival Terminal Upgrade
Testing and Commissioning of HVAC System
Project Overview
Independent Verification Scope
Presidential Flight Arrival Terminal Upgrade is a prominent engineering project in Abu Dhabi International Airport. TAB Engineering Services was appointed for complete testing and commissioning of hvac system, ensuring stringent performance verification and regulatory compliance. Client: Ministry of Presidential Affairs. Consultant: Parsons Overseas Limited. Main Contractor: Bin Hafeez General Contracting Company LLC. MEP Contractor: Greenline Electromechanical LLC VILLAGE MALL - CAPITAL HEALTH SCREENING.
Key Engineering Activities
- ✓ Complete Testing, Adjusting & Balancing (TAB) across primary and secondary distribution
- ✓ Hydronic chilled water flow verification and differential pressure balancing
- ✓ Environmental acoustics, thermal mapping, and BMS interface witnessing
- ✓ Formal certified testing reports issued to supervising consultants
Project Information
Project Status
Completed
(2026 Profile Record)
MEP Contractor
Greenline Electromechanical LLC VILLAGE MALL - CAPITAL HEALTH SCREENING
Client / Developer
Ministry of Presidential Affairs
Project Location
Abu Dhabi International Airport
Sector Classification
Government & Infrastructure
Contracted Scope
Testing and Commissioning of HVAC System