Sheikh Khalifa Central Hospital in Fujairah
Testing and Balancing Of Mechanical System
Project Overview
Independent Verification Scope
Major tertiary healthcare facility constructed under the patronage of the Ministry of Presidential Affairs. Engineering scope included testing and balancing of critical hospital mechanical systems, specialized operating theater HEPA filtration, cleanroom room pressurization gradients, and infection control isolation room airflow verification.
Key Engineering Activities
- ✓ Complete Testing, Adjusting & Balancing (TAB) across primary and secondary distribution
- ✓ Hydronic chilled water flow verification and differential pressure balancing
- ✓ Environmental acoustics, thermal mapping, and BMS interface witnessing
- ✓ Formal certified testing reports issued to supervising consultants
Project Information
Project Status
Completed
(2026 Profile Record)
MEP Contractor
Fibrex Construction Group
Client / Developer
Ministry of Presidential Affairs (MOPA)
Project Location
Fujairah, UAE
Sector Classification
Healthcare
Contracted Scope
Testing and Balancing Of Mechanical System